Total Solutions in 'Controlled Hydraulic Movement'
 
Alveley Foot Bridge 2006

 

A vertical force of 470 kN lifted the centre over 100 mm during the pre-stressing operation
www.billboley.co.uk Bill Boley Ltd
Tel: 01538 300551       Fax: 01538  300028
wboley@billboley.co.uk
geodetic monitoring lifting/lowering propping sliding stressing bridges roads rail buildings chimneys
Roads Buildings Rail Bridges Chimneys